Home Up Site Map Search

Chinquapin Homeowners Association

Antenna & Wiring Basements Deck Approval Exterior Doors Skiylights Windows

blank

Members Only
Newsletters
Decks & Railings

CHINQUAPIN HOMEOWNER'S ASSOCIATION
Architectural Review Committee

Deck Approval Guidelines

[ Decks & Railings Project ]

  1. Chinquapin Homeowner’s “Checklist” for Approval to Construct
  2. Homeowner Request to the Architectural Review Committee
  3. Deck Expansion/Rebuild/Repair Approval Guidelines

Deck Expansion/Rebuild/Repair Approval Guidelines

Deck Approval Guidelines in printer friendly format Printer Friendly Format

The CHOA looks forward to working with the Homeowner and assist with guidance on getting through the various steps in the deck approval and construction process. Any questions involving this process should be directed to the ARC chair person or the designated CHOA representative.

Elective Deck Expansion

  1. All new deck projects will be in conformance with CHOA CC&R’s, Article III, Section 3.
     
  2. The CHOA has developed architectural deck designs for the various types of units found at Chinquapin. One of the Chinquapin approved deck designs must be used, including the privacy options, structural and architectural elements and materials. The CHOA will provide Homeowners a copy of the approved designs. Homeowners are then responsible to hire licensed professionals to complete unit specific designs and structural engineering for their unit/building. This design and engineering must be reviewed and approved by an architect and engineer designated by the ARC, at the owner’s expense.
     
  3. Homeowners are responsible to obtain all necessary permits and approvals from Placer County, the TRPA and any other permitting agencies. The homeowner and their contractor are responsible to adhere to all provisions outlined in the permits.
     
  4. All Homeowners must have written permission from adjacent neighbors to move ahead with a deck expansion project. The CHOA will provide the necessary forms to the Homeowner.
     
  5. The Homeowner will enter into a contract with the CHOA for the construction of the decks. The contract specifies conditions such as the CHOA design and oversight fees, insurance and the responsibilities of both the homeowner, the designated contractor building the decks, and the CHOA for the completion of the project.
     
  6. The Homeowner is responsible for selecting the contractor to do the work. All contractors selected must be licensed in the State of California and must have the proper insurance to work within the CHOA on common area property. The contractor is responsible to build the decks per the provided specifications.
     
  7. The Homeowner will be financially responsible for the project. A personal guarantee or a completion bond will be required. In the event a Homeowner’s deck project is stopped for any reason (other than weather related) for a period of 60 days or longer, CHOA may complete the job at the Homeowners expense. And, any moneys owed by the Homeowner may be collected by CHOA in the same manner as it collects delinquent dues and assessments.
     
  8. Homeowner will pay a fee to CHOA for the development of the deck design including architectural and engineering research and the oversight of the construction of the project. The fee is payable to CHOA at the commencement of deck construction.
     
  9. If the drainage BMP (Best Management Practices) installations have been completed on the Homeowner’s unit prior to the deck expansion project, Homeowner will pay for the installation of any additional drainage BMP’s required due to the Expansion project.

CHOA Deck Rebuild

  1. If it has been determined, by the CHOA, that an existing wooden deck is in need to be rebuilt, the Association, at its expense, will rebuild the deck of the same size using structural and architectural elements and materials as outlined in the Elective Deck Expansion with the exception that the railing inserts will be approved wire mesh.
     
  2. The Homeowner may elect to change to another railing insert from any of the other CHOA approved options. Should there be additional costs over the mesh insert, this cost will be paid by Homeowner.

CHOA Deck Repair

  1. If it is requested by the Homeowner and approved by the CHOA that a wooden deck is in need of repair, the deck will be repaired in wood and in the same size by the Association and at the expense of the Association.

Homeowner Request Contact - WMC Inc

Physical Address
243 N. Lake Blvd., Suite #202, Tahoe City, California, 96145
Mailing Address
P.O. Box 6955, Tahoe City, CA 96145-6955
Telephone
530-583-2713
Telecopier
530-583-2336

mail to: tahoewmc@ltol.com tahoewmc@ltol.com

"Keeping Chinquapin Homeowners Informed"

Hit Counter
URL: http://chinquapinhoa.com/deck-approval-guidelines.htm
Last modified: 08/18/09

Back Home Up Next

Decks & RailingsAntenna & Wiring Basements Deck Approval Exterior Doors Skiylights Windows

Copyright © 2002-2009 Chinquapin Homeowners Association & ComServ4You
Send mail to WebMaster with technical questions or comments about this website.

Members Only Newsletters