CHINQUAPIN HOMEOWNER'S ASSOCIATION
Architectural Review Committee

Contractor & Subcontractor Guidelines

Contractor & Subcontractor acknowledgment of Guidelines (PDF)

The CHOA and all of the homeowners at Chinquapin wish to have a positive and professional relationship with contractors working in the CHOA community. It is of the utmost importance that contractors, subcontractors, and their employees conduct their respective work with the least amount of impact to Homeowners and renters at Chinquapin. With that in mind we ask that common sense be used at all times when planning and working at Chinquapin and in addition the following specific rules and regulations be adhered to. All contractors and subcontractors should be familiar with the CC&R’s of CHOA, these are available for viewing on the CHOA website at www.chinquapinhoa.com.

  1. Contractors & Subcontractors must be licensed in the State of California.
  2. General Contractors may work Monday through Friday from 8am to 5pm. Quiet interior work is permitted outside above limitations provided such enterprise produces no noise detectable outside the Unit in which the work is being done, CC&R’s Article II, Section 6.
  3. Contractors may not bring dogs on the property, CC&R’s, Article II, Section 5.
  4. Contractors must provide Chinquapin’s maintenance company proof of liability, property damage, automobile, and workers compensation insurance. The limits for liability insurance must be a minimum of $1,000,000 with the owner of the property as additionally insured.
  5. Exterior storage units for equipment, furniture, appliances, etc. are not allowed.
  6. Contractors will be issued a date specific parking placard and gate code.
  7. The Placer County Building Permit must be prominently displayed at the work site.
  8. CHOA Contractor Guidelines will be prominently displayed at the work site.
  9. All debris and materials to be disposed of must be housed in a dumpster, a self contained trailer or other appropriate disposal vehicle. Dumpsters and other disposal vehicles shall be staged in the unit’s designated parking space or a space approved by the CHOA and will not be allowed on CHOA property over weekends. Contractor to designate area for disposal of cigarette butts.
  10. The speed limit in Chinquapin is 15 miles per hours. At no time shall any vehicles exceed this speed limit and travel should be less than this speed if pedestrians are present.
  11. All contractors and contractor’s employees shall represent a professional image. This includes wearing shirts and shoes at all times.
  12. Contractor’s vehicles shall not remain onsite overnight. Any and all exceptions to this rule must be approved ahead of time by a CHOA representative.
  13. Parking of vehicles shall be in the designated spots for the unit(s) being worked on. All vehicles must remain on the pavement. Parking off pavement is not allowed and vehicles shall not block walk ways or they will be subject to towing.
  14. Contractor’s work area shall be cleaned up at the end of each work day. Storage of materials is not allowed in unapproved areas per the CC&R’s.
  15. No contractor debris is to be placed in H/Os steel garbage compounds.
  16. Radios and boom boxes are not allowed outside of the units nor heard outside of the units.
  17. Contractors and their sub-contractors are responsible for any damages to the common CHOA property as a result of the project, therefore all contractors will pay a “Construction Fee” for ELECTIVE external and internal remodels, per the following schedule:
     
    1. Projects under $25,000 – no fee.
    2. Projects between $25,000 and $150,000 – fee of $1,500.
    3. Projects over $150,000 – fee of $3,000.
    4. $500 fee refund upon satisfactory cleanup of the project
       
  18. Any infractions from these Contractor & Subcontractor Guidelines will, First result in a disciplinary warning and, Second a fine of $100.00, per incident thereafter, which will be deducted from the refund indicated in “d” above.
  19. Contractor must complete “Contractor Fee Form” and return to the ARC.

Homeowner Request Contact - WMC Inc

Physical Address
243 N. Lake Blvd., Suite #202, Tahoe City, California, 96145
Mailing Address
P.O. Box 6955, Tahoe City, CA 96145-6955
Telephone
530-583-2713
Telecopier
530-583-2336

mail to: tahoewmc@ltol.com tahoewmc@ltol.com

"Keeping Chinquapin Homeowners Informed"

Hit Counter
URL: http://chinquapinhoa.com/contractor_subcontractor_guidelines.htm
Last modified: 02/17/11

Back Home Up Next

ARC Forms Construction Permitting Contractor Guidelines Checklist for Approval Landscaping & Grounds Dollar House Reservations

Copyright © 2002-2011 Chinquapin Homeowners Association & ComServ4You
Send mail to WebMaster with technical questions or comments about this website.

Members Only Newsletters